Zip Mobile now reconfiguring zipper lane
The Zip Mobile is now reconfiguring the H-1 Freeway's zipper lane after crews were able to pump out enough water.
The zipper lane had been stuck in the morning commute position while state Department of Transportation road crews worked to pump out enough water to reconfigure the "zip lane" for the afternoon commute, which starts at 2:30 p.m.
Crews got the water level down below one foot and the Zip Mobile is expected to have the lane reconfigured for the afternoon commute by 3 p.m.