honoluluadvertiser.com

Sponsored by:

Comment, blog & share photos

Log in | Become a member
The Honolulu Advertiser
Posted on: Tuesday, May 27, 2008

'EWA
More lane closures set for Fort Weaver project

There will be single-lane closures on Fort Weaver Road in both directions today through Friday.

Specifically:

  • Southbound, from 8 a.m. to 2 p.m., the right lane between Laulaunui Street and Old Fort Weaver Road will be closed for paving work for the moving and resetting of portable concrete barriers.

  • Northbound, from 9 a.m. to 1:30 p.m., there will be single-lane closures from 'A'awa Drive to beyond the Honouliuli Stream Bridge for trenching and drainage line installations.

    Additionally, traffic on Old Fort Weaver Road may be contraflowed into a single lane near the Fort Weaver Road intersection between 8 a.m. and 2 p.m. daily for waterline installation work.

    The work is part of phase II of a project to widen Fort Weaver Road from four lanes to six, which is expected to run through mid-2009.

    Motorists are advised to use caution while driving through the work area and to allow for extra travel time. Roadwork is weather-permitting.